VILLAGE OF TARRYTOWN
ARCHITECTURAL REVIEW BOARD – REGULAR MEETING
WEDNESDAY, JULY 21, 2010
VILLAGE HALL – 8:00 P.M.
CONTINUED
1. 32 Warren Avenue ARB approval to install new signage.
(Sisters of the Sacred
Heart of Mary)
2. 14 Wood Court ARB approval to install fencing around the rear of the
(Shaw Residence) property.
NEW
3. 93 Altamont Avenue ARB approval for a first and second floor addition.
(Guman/Figler Residence)
4. 55 Heritage Hill Road ARB approval to install new windows, new siding, painting,
(Smith Residence) conversion of closed porch to an open porch and new trim
detail in front of house.
5. 145 Franklin Street ARB approval to install new window to match existing on
(Portuguese American lower level.
Cultural Center)
6. 7 Emerald Woods ARB approval of a 4 foot high picket fence around the rear
(Flanagan Residence) of the property including two gates.
7. 25 Wilson Park Drive ARB approval of siding replacement.
(Meghelli Residence)
8. 75 North Broadway ARB approval for two non-illuminated awnings in front of
(Key Bank) building.
9. 24 John Street ARB approval to repair/renovate existing front porch and
(Paltiel Residence) stone steps.
10. 11 South Broadway ARB approval to install a channel letter sign on the front
(Subway) of the building.
11. 15 North Broadway ARB approval to replace awning sign and logo and text on
(Hinge) door and install a perpendicular sign.
12. 1 Neperan Road ARB approval to install a wall sign and perpendicular sign.
(Sleepy Hollow Chamber
Of Commerce)
|